Mechanical Commercial Permit

CONTRACTORS MUST APPLY FOR THEIR PERMITS VIA THE STATE E-PERMITTING PROGRAM;

Like many building depts. in Oregon, we now use Oregon e-Permitting.

Oregon ePermitting is run by the Oregon Building Codes Division, which allows licensed contractors to apply for MOST building permits with just a few clicks of a mouse!  Participation by cities or counties is voluntary and each participating city or county determines which permits are available for sale online. Most Scappoose Building permits are available via Oregon ePermitting.  To apply, use link below or search in your browser; "Oregon ePermitting".

https://aca-oregon.accela.com/oregon/Default.aspx

  • If you need help, click the "TRAINING" box on the ePermit web page (purple box at the top right.)
  • When you register as a new user, be sure to link your VALID CCB license to your account. Only permits allowed by your license will show up.  If your license if not valid, then no permits will be available.
  • Addresses are very specific in the program and multiple address could exist.
  • Contact the Building Dept. if you are having any issues with the program.
  • Be prepared to upload your plans or you can upload later (click the "Training" box for HOW-TO)

 

ALL ELECTRICAL PERMITS ARE ISSUED THROUGH COLUMBIA COUNTY LAND DEVELOPMENT, CONTACT THEM FOR ELECTRICAL PERMITS AND INSPECTIONS; 503-397-1501 (they also use Oregon ePermitting)

Plans Drawings/Specs.; We do not offer electronic plan review at this time although we do require you to upload your plans into Oregon ePermitting. ALSO mail or deliver 2-sets of plans/drawing to our office.  Standard review time is approx. 2-weeks (could be less depending on scope of work, thoroughness of plans/drawings, and projects in que ahead of you). Please ensure the following is noted on the plans;

  • unit type/specifications
  • location on detailed plot plan (note walls/doors for combustible air requirements)
  • mounting type/location
  • venting detail

ROOF TOP UNITS; We will require detail specifications for any new unit and for any unit being removed.  Specs. must have weight highlighted/circled.  See State of Oregon interpretation below related to additional structural permit requirements.

Permit fees; based on construction/bid value.

 

Scappoose Business License;

In addition to a valid OREGON CCB license, all contractors must also have a City of Scappoose Business License (we are not within the Portland Metro area).   Business Licenses | City of Scappoose Oregon   Submit your business license City Hall or email to City Recorder at;  sreeves@scappoose.gov      

 

If you have any questions, contact Elizabeth Happala at the Building Department.

503-543-7184

scappoosebuildingdept@scappoose.gov

 
 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download