PUBLIC WORKS DESIGN STANDARDS

In addition to the City of Scappoose Design Standards (see supporting documents below), please be sure to meet the Fire Marshal's Property Development Code and the USPS Mailbox standards.  Links to each are included below:  

Any work proposed in the City's Right of Way will require a $250 Right of Way permit;     https://www.scappoose.gov/engineering/page/right-way-row-permit-application

 

Questions, email; engineering@scappoose.gov

 

 
Opens in new window
PDF Download
Word Download
Excel Download
PowerPoint Download
Document Download